During the construction of a storm sewer for Durham’s Gateway Apartments, we installed over 6,000 square feet of temporary shoring up to 26 feet high. This project required us to work in a congested urban site, where we installed a storm sewer adjacent to the off-ramp for the Durham freeway.

During this job, we had to adjust our design to accommodate partially weathered rock that deviated from predictions made during subsurface exploration. We also modified the wall’s design to accommodate existing utilities that were deeper than anticipated. Our limited access equipment and quick response times allowed us to navigate this difficult space with ease.